Monday 27 February 2012

Day 63 Monday 27th February 2012 Fashion Constructed Image weekly Production meeting

Monday 27th February 2012 Fashion Constructed Image weekly Production meeting

As usual we held our weekly meeting using the agenda and miniting the meetings (created by myself). Actions were reviewed and new actions agreed,



Team One


Production Meeting Agenda 27th February

Apologies- None


1. Minutes. Checked and agreed all ok


2. Review individual actions from previous meeting.

· Action: SS to investigate wallpapers further and acquire prices

· Action: MW to acquire year planner and populate

· Both of the above tasks have been pushed back to our next meeting (Action both to complete by then)

3. Narrative Tutorial/Basic set build workshop outcomes and options.

· As a team we discussed the output of both Sam Chicks (SC) Tutorial and Colin Jacksons (CS) workshop, CS had explained that sequencing was of upmost importance. Colin stated that once you have the set designed all the details such as: props, costume, and decor, colour schemes, all come next. From this idea we discussed further our model of the set, we agreed on a more dynamic angle into which the camera/viewer would look into the room. Out of this discussion we drew out ideas and AO took an action to try these options using the model she had created.

· We reiterated the desire for the room to continue to have a western (Anglo American) theme with an Asian female model.

· LN introduced the team to a potential model during the meeting

· AO and SS discussed decor to some depth and it was agreed that they would work together to bring some more detailed selections forward in a visual format as soon as possible.

· We also discussed the type of documents being viewed by the male character in our image and from this a fuller props list was discussed. SS showed a profession props source and we agreed this was a good fall back, should we be unable to source what we needed ourselves. SS spoke to the company during the meeting to discuss prices etc

· Action: AO to try alternate window positions/points of view (by next meeting)

· Action: LN plans to complete a detailed blog entry on what was taught at CS’s Set Build workshop (as soon as possible)

· Action: AO and SS to work together to bring some more detailed selections forward in a visual format as soon as possible

· Action: All to start to look for free/available props

4. Set Design/Models. This was covered during discussion of items in the previous agenda point (3)


5. Collaboration. We have the offer of assistance from Tom Williams via LN, Tom is a fashion student at UCA Rochester with a background in hairdressing as well.

  A.O.B. (lead reports)

· IW proposed that due to mounting work load we increase number of meetings to two per week, all agreed and MW proposed this Thursday 1st March as the best day (due to workshops) All agreed