Tuesday 24 April 2012

Day 87 Tuesday 24th April 2012 Fashion Constructed Image Set-build day 2

Tuesday 24th April 2012 Fashion Constructed Image  Set-build day 2

A number of tasks have been completed today, those include a hands and knees operation to remove sharp staples (applied by previous user) from the carpet, these were seen as a threat to the trail of the dress. By end of play we have positioned one extra small light and provisioned for a second. Our male model has popped in and we has asked if he could kindly pop in with the jackets to test them with the lighting and against the colour palette of the room. The desk has has some blocks cut to raise it slightly and further blocks have been made should we need to raise it further. Ian has been working on the lighting setup, and we have some further ideas to create the effects we desire. We are attempting to keep the work area clean and tidy as we go along as we continue to be on-time and on-plan.

(All images care of Jenna Williams)

Starting to make the 'outside' area more controlled with regards light spill and reflections on the perspex

Adjusting the picture position

Our lighting lead working on the overhead lighting system. With regards H&S we ensured a safety cable was applied to the lights on the rig and all cables were tidied and carefully routed.

Reduced modifier, corridor lights and effects room lights all on

Testing how the lights fall on the material of the dress. We have also worked hard to create 'accurate' reflections in the mirrors of the sideboard. This has included manufacturing a short section of fake wall opposite the door and around the corner from the telephone.

No comments:

Post a Comment